Grout Volume Estimate
Based on the information provided, your project has the following material requirements. Note that partial pallets can not be ordered so the Total Bags row reflect minimum full pallet bag counts.
| | % Solids
GeoPro's PowerTEC (CA Blend) is ONLY available in select areas of Canada. Before selecting this option confirm availability with GeoPro.
Grout Quantities
Grout Product | |
---|---|
Bag Weight | 50 |
Bags Required | bags |
Pallets Required | pallets (bags) |
TEC Quantities
Thermal Enhancement Compound | |
---|---|
Bag Weight | |
Bulk Bags Required | bulk bags |
Bags Required | bags |
Pallets Required | pallets (bags) |
Total Bulk Bags | full bulk bags |
Cement Quantities
Cement Product | Type II Portland Cement |
---|---|
Bag Weight | |
Bags Required | bags |
Project Details
Project Name | |
---|---|
Project Location | |
Number of Bores | |
Total Bore Depth | |
Cased Bore Depth | |
Casing Diameter | |
Uncased Bore Diameter | |
Formation Loss | % |
Grout Volume/Bore | |
Total Grout Volume |